WEBER & TINNEN P.A.  

back_arrow forward_arrow

Structural Engineers    Founded in 1983     

Vinoy Sign

Projects

  • Ultimar - Two 18 Story and one 22 Story Buildings, Clearwater
  • Crescent Beach - Two 18 Story Buildings, Clearwater
  • 22 East Mifflin - 10 Stories, Madison, Wisconsin
  • Vinoy Place - Four 13 Story Towers, St. Petersburg
  • SeaSide - Three 9 Story Buildings, Belleair
  • Holdiay Inn Hotel and Convention Center - 10 stories, Bristol, West Virginia
  • Cypress and Maple Halls - 4 and 5 Story Buildings, University of South Florida, Tampa

Engineering Structures

Logo

 

HIGH & MID-RISE BUILDINGS

  • CRESCENT BEACH CLUB

    photos/H_Crescent_Beach.jpg

    Multi-story concrete buildings framed with conventionally reinforced slab systems on a pre-cast pile foundation.

    Crescent Beach
  • 22 East Mifflin

    photos/H_22_E_Mifflin.jpg

    Ten Story office building plus two parking levels below street

    22 East Mifflin
  • SEASIDE, Belleair

    photos/H_Seaside_062a.jpg

    Three 9 Story Buildings. Designed in reinforced concrete with post-tensioned slabs and an auger cast pile foundation system.

    Seaside
  • VINOY PLACE, St. Petersburg

    photos/H_Vinoy_Place.jpg

    Four 13 story Residential Buildings with Connecting Parking Garage

    Vinoy Place
  • Sheraton Hotel, Jacksonville

    photos/H_Sheraton.jpg

    Structure designed using reinforced masonry bearing walls supporting precast concrete slabs. At the lower levels structural steel rigid frames support both gravity loads and lateral wind loads for the north face of the building. Foundation system is a conventional strip footing shallow foundation.

    Sheraton
  • ULTIMAR

    photos/H_Ultimar_2.jpg

    Multi-story residential project with poured in place concrete systems including post-tensioned concrete flat plate slabs. Foundation systems are pre-cast driven piles with the tallest building on a pile supported mat.

    Vinoy Place